Included with this project is the replacement of three (3) mainline bridges in order to accommodate the widened roadway section. The project is located in Marshall Township in Allegheny County and Cranberry Township in Butler County. Pleasant Road) in order to obtain proper vertical clearance under the PA Turnpike. The project also includes the lowering and reconstruction of approximately 525 feet of T-478 (Mt. This project involves the full depth reconstruction and widening of approximately 2.39 miles of the Pennsylvania Turnpike between the Cranberry Interchange (Milepost 28.49) to the Warrendale Toll Plaza (Milepost 30.88), resulting in one additional travel lane in each direction. This project was completed as an PennDOT HOP Project by Charter Homes. New signal was installed at Rochester Road and Meeder Main Street/Municipal Driveway. This project will be completed by the developer of Meeder Farms. for an additional through lane in each direction, from Commerce Park Dr. Project details and enlarged maps are posted on PennDOT District 10 website.Butler County obtained the BUILD Grant funding for the project with the Township adding funding to both projects as well.The Township owns the design portion of the project and PennDOT then bids and provides construction management. Utility relocation work for Build 2 is tentatively set for 2023 and road widening in 20. It will run from Haine School to Powell Road. Build 1 is currently under construction and is from Commonwealth Drive to Haine School Road.BUILD 1 and BUILD 2 involve the widening of Freedom Road to 5 lanes (2 east, 2 west and a center turn lane).BUILD stands for Better Utilizing Investments to Leverage Development The $9.8 million project is estimated to be completed in Fall 2022. This project is an extension of Freedom Road project which included new highway and turning lanes, widening, paving, drainage, signal upgrade/replacement, lighting work, highway realignment, safety improvements and sidewalks. The impacted area is between Haine School Road and Commonwealth Drive. Work will include short term utility traffic control including evenings and weekends. will be working outside of the shoulder area as construction begins on the second season of the two-year project. As part of a PennDOT project, contractor, Gulisek Construction LLC of Mt.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |